ProformaWorks
Sign in Create an account
Your downloads

Bought as a guest? Your account is already there — sign in with an email link, no password.

Utility-Scale Solar PV Project Model: P50 Bias and Debt Sizing

Size solar project debt the way contracted deals do, on the P50, then see what happens to coverage when the plant runs below its own P50 estimate.

Utility-Scale Solar PV Project Model: P50 Bias and Debt Sizing

The P50 is the number your debt is sized on, and it is not the median. Contracted solar debt is sized on the P50 at 1.25-1.30x coverage, not on the P90, according to the Cost of Capital panels published by Norton Rose Fulbright. The P90 is the lender's stress test. The risk sits upstream of both. The US fleet produces 8.60% below its own P50, which is more than the 6.92% the bank removes in its adverse case.

So a loan can pass the bank's stress case and still sit under pressure in an ordinary year. This model shows that on one loan. In its default case, coverage is 1.30x as sized, 1.1335x in the lender stress and 1.0931x at the observed fleet median, below a 1.20x distribution lock-up. In dollars: sculpted debt of $49,013,364 against $42,621,546 on the corrected production. That is $6,391,818 over-lent, or 13.0% of the advance.

What the model calculates, with its default case:

  • Three generation cases. A 100 MWac / 132 MWdc project in ERCOT at a 24.33% P50 capacity factor. Year-one generation of 203,636, 189,543 and 186,123 MWh for P50, P90 and the fleet median.
  • Sculpted debt sizing. Debt service follows the cash flow instead of a level annuity. Leverage of 35.5% and equity of $88,986,636 on a $138,000,000 cost.
  • Tax value. A net ITC of $38,502,000 and a MACRS shield of $24,633,000.
  • Long-run revenue. A flat $49.00/MWh PPA for 20 years, system degradation of 1.3% a year, opex of $22.50/kWac-year and a 35-year horizon.
  • The revenue gap. $25,659,449 of revenue that the pro forma counts and the plant never produces.
  • Equity returns on all three cases. IRR of 2.87%, 1.31% and 0.90%, with a MOIC of 1.09x.

Read the default case for what it is. It returns little on purpose. The PPA is the 25th-percentile offer, paired with the capex of the cheapest region. It is a starting point, not a forecast of your project. Replace it with your EPC price, your PPA, your lender terms and the sigma values from your own resource report.

What it leaves out: state income taxes, tax-equity partnership flips, DSRA sizing, terminal value beyond the horizon, pre-NTP development costs and re-contracting. The file works in Excel and Google Sheets.

Who it is for: sponsors, lenders and advisers sizing debt on a contracted US utility-scale solar project, who want to test the production estimate before relying on it.

Educational planning tool — not financial, investment or lending advice. Verify the seller's books and your market data, and consult your professionals before buying a business or signing a loan.

Other models in this industry